Revised: March/13





It is recommended that the Board:

1. Approve the McNicoll Bus Garage Draft Environmental Project Report,

2. Note that two Public Information Centers as well as several consultation meetings with the

local Councillor, adjacent property owners, and local community groups have been held.

Additional public outreach will be conducted beginning in September 2014 and the Board will be advised of the results of these meetings, and 3. Forward this report to City Council through the appropriate committee for approval, and to authorize staff to submit the Environmental Project Report (EPR) to the Ministry of Environment.


Funds for the design of a new bus garage at the corner of Kennedy Road and McNicoll Avenue, capable of storing and maintaining 250 buses are available in Project 3.9 McNicoll Bus Garage, under Building and Structures as referenced in the 2014-2023 Capital Budget noted on pages 681-684, as approved by City of Toronto Council on January 29/30, 2014.

The 2014–2023 Capital Budget includes $181M for the project, however, only $80M in funding is available at this time. The funding shortfall of $101M can be addressed in one of two ways. The first option is for the TTC to request additional funding as part of the 2015–2024 capital budget submission. The second option is to build the garage in two stages to correspond to available funding where the first stage provides for storage of the buses only. If option 2 is chosen as the preferred option, there is a risk that the projected cost of $181M may not be sufficient as the operations of the garage would need to be maintained during the construction of the second stage. Furthermore, providing storage-only capabilities will not be acceptable, as maintenance functions are also required.



In the late 1980s Metropolitan Toronto purchased a property southeast of Markham Road and Steeles Avenue East to serve as a location for a future TTC bus garage. By the early 2000s, growth in the north-east part of the city was not progressing as quickly as anticipated, making the Markham and Steeles property less desirable as a bus maintenance and storage location. As a result, when a developer group approached the City and TTC in 2004 with a proposal to acquire the property, TTC staff viewed this as an opportunity to find a more suitable location. A property search identified a 19 acre site in the Milliken Employment District on the north side of McNicoll Avenue east of Kennedy Road. Compared to the Markham and Steeles site, it offered a significant reduction in bus operating costs as it was closer to the routes it would service. The site as shown on Attachment No. 1, was purchased by the City of Toronto in 2005.

The current total capacity of all existing TTC bus garages is approximately 1,630 buses. The existing bus fleet, at approximately 1,700 buses, therefore exceeds this existing capacity. As of 2014, forecasted growth in transit ridership is projected to require the acquisition of approximately 120 additional buses by 2018, some of which will be the significantly longer articulated buses. As a result, bus garage capacity must be increased by over 200 buses within the next five years.

At its meeting on April 30, 2014, a status report on planning activities for the McNicoll Bus Garage was presented to the Board for information.


Purpose of the McNicoll Bus Garage The objective of this project is to provide a new bus garage that will accommodate buses required to meet increased service, improve the existing over-capacity condition at the current bus garages, and provide increased bus maintenance capacity.

Site Location and Study Area The property for the McNicoll Bus Garage is located near the northeast corner of McNicoll Avenue and Kennedy Road in the city of Toronto. The site on which the McNicoll Bus Garage is planned is approximately 19 acres and is currently vacant.

The study area used to assess the potential impacts of the proposed bus garage is bounded by Kennedy Road to the west, Midland Avenue to the east, the north property line of the Scarborough Chinese Baptist Church to the north, and McNicoll Avenue to the south.

The property is zoned “Employment Heavy Industrial”. Other permitted uses include:

• Pesticide or fertilizer manufacturing

• Cement or asphalt plant

• Synthetic rubber manufacturing

• Large scale smelting

• Industrial gas or petrochemical manufacturing


The Process to Date

Under the Transit Projects Regulation of the Environment Assessment Act, transit projects, such as the McNicoll Bus Garage, are exempt from the requirements under Part II of the Act. The new regulation has created a process that allows for a Provincial assessment of potential environmental impacts to be completed and approval to proceed with the project to be obtained within six months of the formal start of the process.

The preliminary planning has been completed for the project and the Transit Project Assessment Process Notice of Commencement will be issued in September 2014. Public consultation has been included throughout the preliminary planning process and further consultation will be conducted on mitigating measures following the Notice of Commencement. The attached Executive Summary and Draft EPR, available at

http://www.ttc.ca/About_the_TTC/Projects/McNicoll_Bus_Garage/index.jsp, provide details on:

1. the process followed to develop the project, 2. the rationale for the design elements selected for the McNicoll Bus Garage, 3. a summary of the environmental impacts of the project and net effects following proposed mitigation measures, and 4. the details of public consultation activities completed to date.

Community consultation in the development of new transit infrastructure is a key aspect of the Transit Project Assessment Process and the TTC’s Good Neighbour Policy. Some changes

incorporated into the design based on the community input include:

1. Reorientation of the fuelling lanes and diesel tanks from the west side of the building to the east side of the building to reduce night time noise and shield the high activity from the residents at the Mon Sheong Long Term Care Facility (Mon Sheong), 2. Relocation of the repair bays from the south side of the facility to the north side to reduce noise impact on Mon Sheong, and 3. Relocation of the vehicle entrance/exit to the north side of the property off Redlea Avenue to increase the distance from Mon Sheong.

Preferred Design

The preferred design as shown on Figure No. E-2, in the attached Executive Summary, includes a 19,000 sq. m lot to the west of Redlea Avenue, used for TTC staff parking. There will be approximately 350 parking spots. Access to the parking lot will be from Redlea Ave. The main facility will sit on a 62,000 sq. m property to the east of Redlea Avenue and is approximately 29,000 sq. m. The main entrance/exit will be on the north side of the property off Redlea Ave, with a second entrance on the south side of the property off Redlea Ave. The facility will operate 24/7 with approximately 100 bus maintenance staff and 400 operators reporting into the facility.

The bus garage will include:

1. Capacity for 250 buses, 2. Two service lines with exterior wash system,


3. Interior bus cleaning area, 4. Repair bays, 5. Steam jenny room (heated power wash) with artic hoist, 6. Materials receiving, storage and distribution area (including loading docks), 7. Bus maintenance and transportation offices, Impact Assessment and Mitigation Detailed assessments of the potential impacts of the bus garage are provided in the Draft EPR. A

summary of the assessment of key issues raised by the community is provided below:

1. Noise concerns – Concerns were raised by local residents on the potential for increased noise levels as a result of the new facility. A Noise Study was conducted using measured existing noise levels to model the predicted impact of the garage. The noise study concluded that mitigations are required to attenuate noise impacts at the Mon Sheong facilities to the southwest. Mitigation measures including false façades atop the west wall of the Proposed Facility and localized rooftop barriers surrounding rooftop noise sources will be utilized. All applicable regulations will be adhered to, 2. Traffic Impact – Concerns were raised by the local community on the impact the facility would have on existing traffic conditions and pedestrian safety. A Traffic Impact Study was conducted based on existing observed and forecasted future traffic volumes. The study indicated that changes to peak hour traffic as a result of the bus garage are insignificant as most bus garage traffic occurs in the off peak hours, 3. Air quality – Concerns were raised on the potential impact to air quality by the local community. In order to assess the potential air quality impact of the project, the predicted effects at sensitive receptors were compared to established guidelines. The maximum combined concentrations of contaminants of interest were all below their respective MOE (Ministry of the Environment) guidelines or Canada Wide Standards (CWS), with minor exceptions. The assessment revealed exceedance of less than 1% of the time for benzene and PM10. As such, mitigation measures are not warranted per MOE guidelines and/or CWS since the contribution to air quality impact from this facility was considered to be minimal, and 4. Safety concerns around the storage of diesel fuel – Concerns were raised on potential hazards associated with the storage of diesel fuel on site. The proposed locations of the tanks meet all railway corridor setback requirements. All storage tanks are double walled, have a 2-hour safety rating, are protected by concrete barriers and bollards, and fuel levels will be monitored to detect leaks. All new fuel tank installations are inspected and


approved by TSSA prior to use and are governed by the standards of the Liquid Fuels Handling Code.

Property Requirements The proposed bus maintenance and storage facility is situated on land currently owned by the City of Toronto and was purchased for this use in 2005. No additional property requirements have been identified or are anticipated for the construction of the McNicoll Bus Garage.

Future Commitments

TTC staff have worked with City staff and technical agencies to address environmental concerns and issues associated with the McNicoll Bus Garage. The potential impacts on traffic operations, transit operations, natural environment, socio-economic environment (including noise, traffic, and air quality) and cultural environment (including archaeology and built heritage), have been identified, evaluated, assessed and mitigation measures, if required, identified. The design process may lead to refinement or modifications to the proposed conceptual design. It is anticipated that such changes will be minor and will not alter the original project intent or commitments to the public and involved agencies. Additional approvals that will be obtained during the design phase are documented in Section 7.3 of the Draft EPR.

Through the implementation process, construction methods and staging will be evaluated to minimize impacts to the surrounding properties. This will include mitigation plans to address construction traffic staging, construction noise, air quality impacts during construction (dust), etc.

On-going liaison with technical agencies and the community is anticipated. The TTC and City of Toronto will comply with regulatory government agencies’ regulations, standards and directives.

In addition TTC is committed to undertake the following initiatives:

Pages:   || 2 |

Similar works:

«Applying behavioural insights to regulated markets The Behavioural Insights Team for Citizens Advice Elisabeth Costa, Katy King, Ravi Dutta and Felicity Algate 26 May 2016 © Behavioural Insights Ltd Contents Forward from Citizens Advice Executive summary 1. Regulating with a focus on consumer behaviour 2. Behavioural biases in regulated markets A. Many consumers will stick with the default B. Consumers can be heavily influenced by anchors C. More choices does not necessary mean better outcomes...»

«References A2 Technologies, http://www.a2technologies.com/exoscan_handheld.html, cached copy 2011; see http://www.chem.agilent.com/enUS/products-services/Instruments-Systems/Molecular-Spectroscopy/4100-ExoScan-Series-FTIR-(handheld)/Pages/default.aspx, last access November 2014. d’Abbadie, Antoine (1859), Catalogue raisonné de manuscrits éthiopiens appartenant à Antoine d’Abbadie, Paris: Imprimerie Impériale. ʿAbd al-Qādir Mammā Ḥaydara – Ayman Fuʾād Sayyid (2000–2003), ‫(...»

«Proseminar „Social Cognition” Mag. Dr. Andreas Olbrich-Baumann WS 08/09 Implicit Impressions Implicit Impressions James D. Uleman, Steven L. Blader and Alexander Todorov Proseminar „Social Cognition” Mag. Dr. Andreas Olbrich-Baumann WS 08/09 Implicit Impressions Inhaltsverzeichnis 1 Einleitung 3 2 Nachweis für die Existenz impliziter Eindrücke 4 3 STIsspontane Eigenschaftsrückschlüsse 6 3.1 Verbindung von spontanen Eigenschaftsrückschlüssen mit den Akteuren 6 4 STTsspontane...»

«Learn Security Online, Inc. © https://www.learnsecurityonline.com/ What is TEMPEST? Ok prepare to strap that tinfoil hat on two notches below excruciating; we’re going to talk about TEMPEST. What is TEMPEST? It’s defined in NSTISSI-7000 as: Electronic and electromechanical information-processing equipment can produce unintentional intelligence-bearing emanations, commonly known as TEMPEST. If intercepted and analyzed, these emanations may disclose information transmitted, received,...»

«III Boris Röhrl Realismus in der bildenden Kunst Europa und Nordamerika 1830 bis 2000 Gebr. Mann Verlag · Berlin IV Bibliografische Information der Deutschen Nationalbibliothek Die Deutsche Nationalbibliothek verzeichnet diese Publikation in der Deutschen Nationalbibliografie; detaillierte bibliografische Daten sind im Internet über http://dnb.d-nb.de abrufbar. © 2013 Gebr. Mann Verlag · Berlin www.gebrmannverlag.de © VG Bild-Kunst, Bonn 2012 Alle Rechte, insbesondere das Recht der...»

«1 Niemals aufgeben, sagt Hannes Androsch RADIO50PLUS, 11.11.2015 (Transkript) Niemals aufgeben ist der Titel des letzten Buches von Hannes Androsch. Seine Lebensbilanz und Ausblick, aufgezeichnet von Peter Pelinka. Hannes Androsch, legendärer Finanzminister der Ära Kreisky, Chef der CA Creditanstalt Bankverein, Industrieller, Mäzen und Elder Statesman, sagt offen seine Meinung. Er zieht zum ersten Mal sehr privat und ausführlich Bilanz über sein Leben, seine politische Sicht zur Zeit und...»

«Handbuch Der Deutschsprachigen Emigration Handbuch der deutschsprachigen Emigration 1933-1945 1933 1945 Chef und Effenberg stellten Millionen des vergangenes Schreibtischlebens mit SPIEGEL bezahlen. getty. Heinz spielt sich nur im grosse Erinnerungen des Handbuch der deutschsprachigen Emigration 1933-1945 nach weniger Unsinn seit Konjunktur positiven und nach 1 verbesserte Ordnung kath. Studie vor Wahl schlecht. Er wollen bereits und eigenen und freie angelegte Grube zeigen....»

«Fachbereich Tourismus Bachelor-Thesis Danny Begerow Interkulturelle Managementaufgaben für touristische Leistungsträger Deutschlands am Beispiel der Vereinigten Arabischen Emirate Referenznummer: 14092012 I Inhaltsverzeichnis Inhaltsverzeichnis Tabellenverzeichnis Abstract 1. Einleitung 2. Interkulturelle Managementaufgaben im theoretischen Kontext 2.1 Das Fünf-Dimensionen-Modell von Hofstede 2.2 Das Kulturmodell von Hall 2.3 Gemeinsamkeiten und Unterschiede beider Kulturmodelle 2.4 Inhalte...»

«Diskussionsforum zu IASB ED Investment Entities IASB ED Mandatory Effective Date of IFRS 9 IASB ED Improvements to IFRSs IASB RfV Agenda Consultation 2011 – Protokoll der Diskussion vom 7. Oktober 2011 – Dauer und Ort: 7.10.2011, 13.00 Uhr bis 16.30 Uhr, Airport Conference Center, Frankfurt Teilnehmer auf dem Podium: Liesel Knorr (DSR; Mitglied EFRAG TEG und PRC) Prof. Dr. Andreas Barckow (DSR) Hans Van Damme (EFRAG – Mitglied Supervisory Board und PRC) Dr. Elke König (IASB) Rasmus...»

«Zeitschrift für Interkulturellen Fremdsprachenunterricht Didaktik und Methodik im Bereich Deutsch als Fremdsprache ISSN 1205-6545 Jahrgang 15, Nummer 2 (Oktober 2010) Von Australien lernen – Erfolg durch „konsequente Sprachförderung“ an australischen Grundschulen/NSW Sabine Jasny Department of Germanic Studies Room 516, Level 5, Brennan/MacCallum Building A18 The University of Sydney Sydney, NSW 2006 Australia Telefon: +61 2 9036 6480 E-mail: sabine.jasny@sydney.edu.au Abstract. Nach...»

<<  HOME   |    CONTACTS
2016 www.book.dislib.info - Free e-library - Books, dissertations, abstract

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.