OECD Directorate for

Science, Technology and Industry (STI)

COUNCIL WORKING PARTY ON SHIPBUILDING

COMPENSATED GROSS TON (CGT) SYSTEM

Contact:

Mr. Danny Scorpecci, Structural Policy Division, Directorate for Science, Technology and Industry, OECD

Tel: +33 1 45 24 94 33 - Fax: +33 1 44 30 62 57 - E- mail: danny.scorpecci@oecd.org

ORGANISATION FOR ECONOMIC CO-OPERATION AND DEVELOPMENT

A NEW COMPENSATED GROSS TON (CGT) SYSTEM - 2007

BACKGROUND

1. The compensated gross tons (cgt) concept was first devised by shipbuilder associations, and adopted by the OECD Council Working Party on Shipbuilding (WP6), in the 1970s to provide a more accurate measure of shipyard activity than could be achieved by the usual gross ton (gt) and deadweight ton (dwt) measures.

2. The concept underwent a number of revisions, with the present system introduced in 1984 and most recently updated in 1994. Since that time the shipbuilder associations have undertaken a major overhaul of the concept, in order to improve accuracy and to better reflect changes in both shipbuilding designs and working methods in shipyards.

3. The new cgt system described in this document was jointly developed by the Community of European Shipyards Associations (CESA), the Shipbuilders’ Association of Japan (SAJ) and the Korean Shipbuilders Association (KSA), who together represent around 75% of world shipbuilding output. The cgt system is widely used in the shipbuilding industry, and there has been an expectation for some time that a revision of the existing system would be undertaken.

4. As in the past, this new cgt system has been adopted and promulgated by the OECD Council Working Party on Shipbuilding in order to give the system a solid basis for its continued widespread use within the industry. The Working Party decided that the new system would come into force on 1 January 2007.

5. This document is a user guide for practitioners, and provides detailed information on the concepts behind the new cgt system as well as the formula (instead of the coefficients that were used in the old system) used to convert the gross ton (gt) measurement of vessels to the compensated gross ton (cgt) equivalent.

THE NEW CGT SYSTEM

As well as giving the details of the new system, this document also reflects ideas, concepts and some facts for those interested in a more fundamental explanation of the cgt system.

The purpose of the cgt system

6. The question of establishing a consistent unit of measurement for new building production by shipyards was considered at meetings in 1966 and 1967 between the Community of European Shipyards Associations - CESA (at that time named the Association of West European Shipbuilders - AWES) and the Shipbuilders' Association of Japan - the SAJ. A joint system for calculating compensated gross tonnage (cgt) was introduced by the associations in 1968, and this was subsequently adopted and promulgated by the OECD.

7. Since then, a number of revisions have been undertaken. These have taken into account the development of shipbuilding technology and new ship types, but the scope and definition of compensated

tonnage has been unchanged, that is:

“Compensated gross tonnage, (cgt), is a unit of measurement intended to provide a common yardstick to reflect the relative output of merchant shipbuilding activity in large aggregates such as "World", "Regions" or "Groups of many yards".

8. The cgt-system is a statistical tool developed in order to enable a more accurate macro-economic evaluation of shipbuilding workload than is possible on a pure deadweight tons (dwt) or gross tons (gt) basis.

9. Statistical information on new ships completed is available on a country or global basis in gross tons, as well as partly in deadweight tons. Figures in gross tons are available for all ship types, but not the number of man-hours, the use of materials and the amount of yard-hardware used in their production.

Resources used to build one gross ton differ widely with the size and type of ship. By multiplying figures in gross tons with cgt coefficients, which reflect the work content of each type and size of ship, it is possible to convert the ever changing product mix into cgt figures, which reflect with some accuracy worldwide shipbuilding activity.

10. However, the system has some limitations, as the macro-economic focus of the system has meant that certain simplifications have been necessary, and if applied for micro-economic evaluations the compensated tons system might give misleading results.

Introduction 11. The system of conversion coefficients for calculating compensated gross tons that is being replaced by the new system was elaborated by CESA and the SAJ during 1982/83, and implemented by the OECD in 1984. It has since been recognised as superior to gross tons as a tool for measuring workload and output of shipyards.

12. At that time it was also anticipated that the development of new ship types, and of new shipbuilding technology, would from time to time create the need for revision of the system. Such a revision became necessary following developments in shipbuilding during the 1980s, and in 1993 CESA and SAJ revised the system through a series of partial and intermediate revisions of selected cgt coefficients. These were agreed to and promulgated by the OECD in 1994.





13. Further work has since been undertaken to further improve and simplify the cgt system, while at the same time seeking to maintain continuity by preserving the macro-economic scope of the system.

14. The Korean Shipbuilders Association - the KSA, took part in this additional work.

Difficulties in the evaluation of cgt factors 15. At a first glance, the calculation of cgt factors seems to be a simple task: for each ship type, and ship size, collect information on the workload necessary to build a single gross ton, relate these data to a basic ship type, and the results will be the cgt factor.

16. However, when it comes to details, practically no shipyard builds a ship in the same way as its competitors. One of the major differences is the production depth i.e. the amount of parts and blocks produced in the shipyard, relative to the amount which is subcontracted to outside suppliers.

17. The traditional style of construction is where yards build ships by buying in only raw materials, and handcrafting even the nails for wooden constructions within the yard, whereas modern yards may base their production to a large extent on assembling large sections of steel blocks produced by external suppliers. In some cases even whole hulls may be outsourced. As a consequence, the man-hours used within each yard will differ widely in these cases.

18. Similarly the degree of rationalisation and the range of shipbuilding equipment, such as cranes and machine tools, will vary considerably and these will also influence the man-hours necessary for the building of a specific ship.

19. For ships of the same size and type, differences in hull-form, maximum speed and the means of propulsion, the equipment and quality level, will all result in differences of workload for the building of a single gross ton.

20. Keeping in mind that the purpose of the cgt factors is to allow the drawing of certain conclusions at the macro-economic level, the associations decided to restrict the number of ship types and conversion factors to a manageable number, and to accept that although this will produce results which are sufficiently accurate for the purpose for which they are intended, they will not be perfect.

21. It should also be kept in mind that most data sources used for cgt calculations contain only part of the detailed information which may be needed for more detailed evaluations.

22. One way to overcome the problems resulting from the difference in production depth is to define a certain production depth as an average, and then based on this starting point to calculate the cgt factors as workload (expressed in man-hours) per gross ton.

23. A different methodology was used in the calculation of the original cgt coefficients. There, a certain type of vessel was defined as the base and given a compensation factor of 1. The relative workload per gt for other types of vessels and sizes, in proportion to that basic ship, was then used to calculate index figures.

24. It may be assumed in all cases that the production depth of a certain yard is more or less independent of the type and size of ships which are produced.

25. It has been demonstrated on a trial basis that the existing cgt coefficients enable the drawing of certain conclusions on man-hours for individual yards or groups of yards with similar production depth.

Based on cgt calculations, a relationship has been found between man-hours and cgt produced for the specific yard in question. This proves the value of the present system.

26. However, it has also been shown that one of the main problems in drawing these conclusions is the format in which the factors are available. Due to several difficulties at the time of the development of the present cgt coefficients, it was only possible to present them in a simple table split into types of ships, with the effect of size of the vessel being accounted for by step calculations, which yielded the different cgt coefficients. These steps took into account the prevailing vessel sizes at the time, and relevant cgt coefficients were established for the typical size of ship in each group.

27. An inevitable consequence of the step function approach was that for ships with a tonnage near the size boundaries - particularly for smaller ships - this produced some inaccuracies. For example, the calculated cgt of a passenger vessel with a planned size of 9 950 gt, delivered with a tonnage of 10 050 gt, would be reduced from 29 850 cgt to 20 100 cgt due to this relatively small increase in gross tonnage.

28. Furthermore, the use of cgt coefficients for the comparison of production efficiency expressed in cgt output per year and number of employees for different shipyards (a measure often found even in serious publications), is misleading as long as the production depth of the yards being compared is not taken into account. A yard or a group of yards with low production depth would wrongly appear to have a high efficiency compared to a yard with higher production depth, if the comparison only takes into account the cgt delivered in a year divided by the number of direct employees of those yards.

29. It seemed appropriate that a revision should take into account not only the influences of new technology, e.g. double-hulls or other ecologically friendly design features or the shift to different LNG tank-constructions, but also introduce a curve based system in place of the existing one based on step functions. Introducing a curve based system would not only improve accuracy, but would also reduce the need for regular reviews in order to compensate for the effect of changes in the size of typical ships in the different ship type groups.

30. The new curve based system that has been adopted also uses gross tonnes (gt) as the basis for all cgt calculations, rather than the former grouping of vessels according to their dwt measurement. This is because in many cases dwt figures are not exactly comparable, as the announced figures may be based on different conditions, like summer or winter draft or scantling or design draft, all matters which are not easy to check. In addition, in the case of some vessels (such as passenger ships and other non-cargo carrying vessels) dwt measurements are not available, a fact which created some problems with the existing system.

31. Therefore, the associations decided that the base for the new cgt system should be gross tons (gt), which are available for all ship types. It is acknowledged that some exemptions still apply to the calculation of gt for some ships in national and coastal waters, but these will not greatly affect the revised cgt system.



Pages:   || 2 |


Similar works:

«Peter Aronsson Linköping university, Sweden petar@isak.liu.se Preliminary draft for MIT4 2005, not to be quoted without permission. The migration of The Emigrants. “Moberglands” in media and on both sides of the Atlantic In the middle a shared experience: the agony and expectations of emigration. A real history split into two, a history of the lean, crowded patches of Småland and the need for strong arms on the virgin prairie. Compulsory state-church conformity and military needs of well...»

«C M Y CM MY CY CMY K Die Autoren: Polizei + Forschung Prof. Dr. Hermann J. Liebel, Universitätsproof. Dr. fessor für Angewandte und Sozialpsychologie, Diplom-Psychologe, Direktor des Forschungsinstituts zur Wirtschaftskriminalität im Praxisforum an der Universität Bamberg – Arbeitskreis für Wirtschaft und Wissenschaft e. V V. Hauptforschungsgebiete: Psychologietransfer, Kriminalpsychologie, Psychologie des Geldes. Prof. drs. Koos J. Swanink, MBA, Prof. of of. International Management,...»

«TECHNICAL UNIVERSITY BERGAKADEMIE FREIBERG TECHNISCHE UNIVERSITÄT BERGAKADEMIE FREIBERG FACULTY OF ECONOMICS AND BUSINESS ADMINISTRATION FAKULTÄT FÜR WIRTSCHAFTSWISSENSCHAFTEN Michael Fritsch Andreas Stephan What Causes Cross-industry Differences of Technical Efficiency? – An Empirical Investigation∗ FREIBERG WORKING PAPERS # 13 FREIBERGER ARBEITSPAPIERE 2004 The Faculty of Economics and Business Administration is an institution for teaching and research at the Technische Universität...»

«Magisterarbeit Titel der Magisterarbeit Economic policies shaping Market Economy in Albania Verfasserin Vanina Kureta Angestrebter akademischer Grad Magistra der Politikwissenschaft Wien, im 15.11.2010 Studienkennzahl lt. Studienblatt: A 300 0109903 Studienrichtung lt. Studienblatt: Politikwissenschaft Betreuerin/ Betreuer Univ.-Prof. Dr. Dieter Segert Acknowledgement The results of this thesis have been possible thanks do the enormous support of my Family. Their love and dedication from the...»

«Justus-Liebig-Universität Gießen Fachbereich 07: Mathematik und Informatik, Physik, Geographie Institut für Geographie Outward FDI from China Historical Development, Geographical Distribution and the Obstacles to Subsidiary Business Success Dissertation zur Erlangung des akademischen Grades Doctor rerum naturalium (Dr.rer.nat.) Vorgelegt von Yuefang SI, M Sc. Erstgutachter: Prof. Dr. Ingo Liefner Zweitgutacher: Prof. Dr. Gang Zeng Gießen, Juni 2013 Wissenschaftliche Betreuung: Prof. Dr....»

«Publikationen, Vorträge, Forschungsprojekte, Lehre, Auszeichnungen, Mitgliedschaften Priv.-Doz. Dr. Michael Litschka 1. Publikationen Bücher Litschka, M. (2013): Medienethik als Wirtschaftsethik medialer Kommunikation. Zur ethischen Rekonstruktion der Medienökonomie. München: kopäd.Litschka, M./Suske, M./Brandtweiner, R. (2011): Managemententscheidungen in moralischen Dilemma-Situationen. Fragen der Organisation und Kommunikation wirtschaftsethischer Konzepte. facultas. Wien: facultas.wuv....»

«THE “NEW PROTECTIONISM” AND THE AMERICAN COMMON MARKET Norman R. Williams* & Brannon P. Denning † For nearly two centuries, the U.S. Constitution through the dormant Commerce Clause has protected the American common market from protectionist commercial state regulations and taxes. During the past two terms, however, the U.S. Supreme Court created a new exception to the dormant Commerce Clause for protectionist state and local taxes and regulations that favor public rather than private...»

«06_578197 ch01.qxd 3/24/05 9:34 AM Page 3 WHY DO HORSES (USUALLY) DO WHAT WE TELL THEM? AL RI TE L ong before we rode horses, we hunted them, killed them, and ate them. In more recent times, we’ve developed elaborate methods to dominate them MA and make money from them. We’ve turned them into beasts of burden, starved them, beaten them, and sent them to war, even while glorifying the “noble horse” in songs, stories, and beautiful pictures. And in some cultures, we still eat them. ED...»

«Seite 1 / 17 Matthias Horx Gameolution Die Evolution der Computerspiele – und der menschlichen Zivilisation Am Anfang war das Spiel. Als sich vor Milliarden von Jahren aus dem kosmischen Staub die ersten komplexen Moleküle formten, begann das Spiel der Verbindungen. In immer steigender Komplexität fügte sich Kohlenstoff zu organischer Materie, und schließlich zu Organismen zusammen. Das Spiel des Lebens begann. Die Gesetze des Spiels sind allgegenwärtig. Wirtschaft ist ein Spiel. Heirat,...»

«Hans-Peter Müller, Universität Zürich, e-mail: hpm68@gmx.net. Website: www.ethnomaps.ch 1 KONSTRUKTION VON ETHNOLOGISCHEN ANALYSEEINHEITEN (EAE) Ausgangspunkt für alle nachfolgenden Beispiele bilden die im Ethnographic Atlas kodierten Bevölkerungsgruppen. Dabei werden Unschärfen soziokulturelleR Repräsentation sichtbar, die für die meisten Länder charakteristisch sind. Sie fordern Entscheidungen statt die simple Anwendung von Verfahrensregeln. Über die ethnische oder...»





 
<<  HOME   |    CONTACTS
2016 www.book.dislib.info - Free e-library - Books, dissertations, abstract

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.